¡ñInitial Budget
Once a project is determined, so it is with process frame and function. A good beginning is half the success. This course comesdown to determination, analysis, deletion and the outcome of a best layout. We put emphasis upon general equipment and production problem, make certain of performance requirement, collect operation information, form a complete production line and study out the budget. Thus, we get a feasible layout and all information will be top secret.
¡ñQuotation
Once the project is studied out, there will bea quotation. The materials include outline, quotation demand, technical requirements and description of the system, equipment function and other items. In doing so, one can make a just judgement for machinery parts, quoteprice, system and the manufacturer when choosing a partner.
¡ñDesign
A project team will fall to work formally after the quotation is done. A meeting will be held at regular intervals among project manager, salesmen and consigner in order to make out all details and get a final documentation, which will be used for production and fieldwork after auditing.
¡ñPurchasing
Most facilities are self-optional to ensure compatibility and project schedule. It also helps shorten the time from order to delivery.
¡ñManufacture
The approved documentation is the foundation of production. Any equipment that is notmanufactured on the spot should be identified by our quality control expertsaccording to strict stipulations. Inspections should be done at regular intervals to make it sure that subcontractors are also up to quality standard.
¡ñTest and Inspection
All systems must be checked according to concerted procedures. If one wants the check work done in his own way, we can alsoarrange it for him.
¡ñDelivery and Equipment Start-up
Based on years of experience, the technicalrules of installation will help simplify the start-up test of equipment. During the course, our engineers will provide spot guide and carry out project test and check for equipment. Result obtained will be handed to buyer's representatives for review. The acceptance of the result will indicate the acceptance of the system.
¡ñTraining
Before installation and start-up, the operators will get trained. The contents may bespot explanation and operational maintenance training.
¡ñMaintenance Service
To ensure the normal production, the maintenance and spare parts can be providedby Longqing Company. The maintenance agreement can be aimed at a single machine, several production lines or the whole plant. The agreement may be one part of the original contract or is to be made later after the equipment is newly put into operation.